Recent-Post

3/recent/post-list

Jawa Power-YTL Build PLTS 51 kWp


Jawa Power-YTL build solar power plants (PLTS) Photovoltaics with a capacity of 51 kilowatt peak (kWp).
 
Photovoltaic solar power is built in the area of ​​Housing Employee-YTL Jawa Power in the district Paiton, Probolinggo.

Based on the press release received by Business, YTL Jawa Power and claims since it began operations on September 21, 2016 Photovoltaic solar power has supplied an average of around 40% of electricity needs during the day in the employee housing.
 
Reduction in electricity consumption, equivalent to a saving of around Rp 120 million per year and a reduction in CO2 emissions by 80,000 kg per year.
 
Previous private power developers have been developing renewable energy-based electricity generation based on domestic biogas, Micro Hydro Power (MHP) and solar powered lighting.
 
Photovoltaic solar power with the largest capacity in East Java was designed by the company, assisted by a German international cooperation agency, Deutsche Gesellschaft fur Internationale Zusammenarbeit (GIZ) GmbH.
 
This technical assistance is part of the project Promotion of Least Cost Renewable Energy (LCore-Indo), which is implemented by GIZ on behalf of the German government together with the Directorate General of Renewable Energy and Energy Conservation (DG EBTKE) Ministry of Energy and Mineral Resources (ESDM) Republic Indonesia.
 
The main objective of this renewable energy facility is a solar power installation Photovoltaics indicating reliability and reduce power consumption of electricity during the day, thereby contributing to the reduction of greenhouse gas emissions (CO2). The facility was designed without using a battery so as to minimize maintenance costs.

0 Comments:

Posting Komentar